Project
Two SiteWash 10 systems on a semiconductor fabrication plant
400 trucks a day, 24 hours a day, for two years, with no unplanned downtime.
- Systems
- 2 × SiteWash 10
- Wash passage
- 32 ft 10 in (10 m) each
- Tanks
- 33,000 gal (125,000 L) steel, each
- Traffic
- 400 trucks a day
- Operation
- 24 hours a day
- Duration
- 2 years
- Downtime
- No unplanned downtime
- Client
- Global chipmaker
Requirement
The requirement
Two site exits on one of the largest construction projects in Europe, with continuous earthworks, hundreds of truck movements a day, and a client that audits every environmental control on site. The wheel washes had to run around the clock, keep up with peak traffic and stay off the critical path.
Engineering
The engineering
A SiteWash 10 at each exit, sized from the traffic and ground assessment. Each system ran from its own 33,000 gal (125,000 L) steel tank, so water volume never limited throughput. Installed, tested and commissioned by Glanaco.
Evidence
The result
Two years of continuous operation at 400 trucks a day, with no unplanned downtime.

Tell us about your site
Describe the entrance, the traffic and the timeline, and we will recommend the right system.